Work Commences to the 7th Approach



First up is the redraining of the 7th Approach. Over the years this area has got wetter and wetter. There is old clay pipe drainage in here but these pipes have either collapsed over time or got blocked up by root roots. The system to be installed here will reconnect the two ditches from left to right and then reconnect the green to the ditch on the right of the fairway. Weather permitting this work should be completed by the end of the week. In the mean time a temporary green will be in play in the fairway. Looking at the course this morning, this work is well overdue!